Referances
 

Capacity Of the Plant1

Capacity Of the Plant2

Our Scope 



Manufacturing of Watermeter1

Manufacturing of Watermeter2

Electrical&Instrumentation jobs 

 

 

Beginning date Plant 1

 

24.4.2004

 

Beginning date Plant 2

 

10.6.2009

 

 

Technical Person

 

2 Engineer
2 Forman
6 Electrical skilled
1 Mechanical skilled
1 Welder
15 Helper

 

 
Some quantities on our Scope

TR Installation(1x1600+1x2500)
Generator Installation 
ADP Installation
MCC Installation
DistributionPanels
Cable tray Installation(100-600mm) 
Conduit Installation(1/2 "- 6 ") 
Instrument Installation
Power cable Installation
Signal Cable Installation
F/O Cable Installation
MV Cable Installation
Lighting Cable installation
Lighting Poles & Fixtures


4.100 Kva
750 Kva
1 Nos
1 Nos
12 Nos
600 mt
240 mt
17 Nos
3450 mt
2100 mt
170 mt
360 mt
1600 Mt
280 nos
 
     
     

Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa
Çimsa

Çimsa

Çimsa